The Bridge
-
- Posts: 19
- Joined: Thu Nov 14, 2013 2:04 pm
Re: The Bridge
I hope you feel better soon.
Re: The Bridge
Thanks....apart from my left side feeling slightly uncomfortable, I'm just about back to some form of normal.I hope you feel better soon.

Anyway, I've started working on 'tuther end of the layout..Sections 6 & 7 to be precise: The Sea Life centre to the left, the base of the North cantilever tower in the background, and part of the old village of North Queensferry in the foreground....where there's lots of buildings yet to position.
Re: The Bridge
This shot doesn't look that much different from the last one. I have, however started adding some of the finer detail such as fences and hedges and re-contoured some ground profiles.
I'm also being slowed by having to fit buildings into the road sections where there's a slope in the road surface. Four of the buildings in the left front corner are set into the road in this way.
I'm still working very carefully and in short stints to protect the area around my ribcage from being strained. It's still uncomfortable....and I really don't want to trigger the sort of pain attacks I had over last weekend.

I've also had to re-design, print and paint one of the buildings. I originally thought it would be only half on the layout and created it half cut off, but then found it would all fit, so had to re-make it.
I'm also being slowed by having to fit buildings into the road sections where there's a slope in the road surface. Four of the buildings in the left front corner are set into the road in this way.
I'm still working very carefully and in short stints to protect the area around my ribcage from being strained. It's still uncomfortable....and I really don't want to trigger the sort of pain attacks I had over last weekend.



Re: The Bridge
Take care Doug, I have severe problems with muscle pain/strain in my chest and know how bad it can be.
Mike
DON'T knock it at least I am trying to do something, with only one good hand.
DON'T knock it at least I am trying to do something, with only one good hand.
- SmallCentral
- Posts: 42
- Joined: Thu Dec 18, 2014 8:32 am
- Location: France , near Toulouse
Re: The Bridge
+1Nutter wrote:Take care Doug,
Re: The Bridge
I know it's a small landmark...but it's a landmark!
Layout section 6 is now complete apart from the shoreline and water surface. That's three out of eight sections to reach that state.....
Layout section 6 is now complete apart from the shoreline and water surface. That's three out of eight sections to reach that state.....
Re: The Bridge
Steady progress being made...
I now have another bit of the scenery completed. It's still wet, which explains why it's looking lighter than the adjacent section: I'm currently ploughing through the old village of North Queensferry and its road layout. Here's the latest shot: The Sea Life Centre car park is down, awaiting its access road. Having fitted three or four particularly awkward 3D printed parts, I'm quite chuffed with the complex junction of Main Road, Ferryhill Road and Old Kirk Road: The photo doesn't show it very well, but none of the printed bits are at the same level as anything else. One thing you can see in the bottom shot is the war memorial and a couple of seats in the yet to be completed gardens.
I now have another bit of the scenery completed. It's still wet, which explains why it's looking lighter than the adjacent section: I'm currently ploughing through the old village of North Queensferry and its road layout. Here's the latest shot: The Sea Life Centre car park is down, awaiting its access road. Having fitted three or four particularly awkward 3D printed parts, I'm quite chuffed with the complex junction of Main Road, Ferryhill Road and Old Kirk Road: The photo doesn't show it very well, but none of the printed bits are at the same level as anything else. One thing you can see in the bottom shot is the war memorial and a couple of seats in the yet to be completed gardens.
Re: The Bridge
And with a layout section re-shuffle, the light at the end of the tunnel (scenery wise) is in sight!!!

This shot shows sections 7 & 8, which is the very north of the layout. Once all this is sceneried, there's just an island on section 4 or 5 to do!!


Re: The Bridge
All I can say is WOW
Mike
DON'T knock it at least I am trying to do something, with only one good hand.
DON'T knock it at least I am trying to do something, with only one good hand.
Re: The Bridge
Those car parks still look remakably bare.
When do you intend to strike up production on the cars?
Or is Cowley still out on strike
?
When do you intend to strike up production on the cars?
Or is Cowley still out on strike

Re: The Bridge
Well volunteered! I'll have as many as you can do.When do you intend to strike up production on the cars?

Well, the tarmac might still be warm (well, damp really!) .....but we're ready for McWimpey to move in! And the landscape gardener is on standby!

Re: The Bridge
QUOTE "Well volunteered! I'll have as many as you can do. "
Although I did in a roundabout way work for Peugeot (Assembling wiring looms), I do not own a 3D printer
Although I did in a roundabout way work for Peugeot (Assembling wiring looms), I do not own a 3D printer

Re: The Bridge
Well the builders are in.....
Got distracted earlier today by an email. I'd just squirted one part of an epoxy mix on a piece of card...then quickly read the email. I squirted the second part of the epoxy, mixed it and glued four or five buildings down. Five minutes later, the epoxy had not set! I then realised I 'd used two lots of hardener in the mix...and no resin! Duh!!
Epoxy is messy stuff to remove.
About 70% of the buildings in view are fixed in position. I need to paint ground textures next so I can fix the rest of the buildings....and then there's fences and trees, etc.
Got distracted earlier today by an email. I'd just squirted one part of an epoxy mix on a piece of card...then quickly read the email. I squirted the second part of the epoxy, mixed it and glued four or five buildings down. Five minutes later, the epoxy had not set! I then realised I 'd used two lots of hardener in the mix...and no resin! Duh!!


Re: The Bridge
Well, I think I'm going to have to watch a film or something!!
I've had another productive day. I have a batch of freshly assembled trees drying. I have a batch of fences and hedges pinned and glued in place, drying. And I have a couple of road sections freshly glued together and varnished, drying!
And its getting close to the time when I need to start the countdown clock.
The 17th June is not that far away!
I've had another productive day. I have a batch of freshly assembled trees drying. I have a batch of fences and hedges pinned and glued in place, drying. And I have a couple of road sections freshly glued together and varnished, drying!
And its getting close to the time when I need to start the countdown clock.




Re: The Bridge
Have you got all the bridge sections completed yet or is there likely to be some last minute 3D printing activity. 
How about A Bridge to Far as a film to watch

How about A Bridge to Far as a film to watch

Mike
DON'T knock it at least I am trying to do something, with only one good hand.
DON'T knock it at least I am trying to do something, with only one good hand.
Re: The Bridge
I have a few pieces of the two truss sections that join the cantilever sections yet to print....so, yes, there will be a bit more printing to do.Have you got all the bridge sections completed yet or is there likely to be some last minute 3D printing activity.
I've not had chance to do too much today as I've been out most of the day. I have, however, managed to glue down a tricky piece of road that feeds houses on four different levels!! Once this bit is dry, I can start laying down the final set of road sections that cover the high-level section of North Queensferry.
"Les Amants du Pont-Neuf" might have been a more appropriate film to watch.

Re: The Bridge
I'm progressing well with the final set of road sections.
All bar five sections are now fitted into place, which required a lot of careful sanding to get the ground profile right! Here's the current state: Believe it or not, but I'm being slowed by not having enough pins. I have more than a hundred....but need to use a lot to hold down the edges of the sections whilst the glue is drying.
If I can get the scenery at this end of the layout finished by the end of this week, then I'll be happy!
All bar five sections are now fitted into place, which required a lot of careful sanding to get the ground profile right! Here's the current state: Believe it or not, but I'm being slowed by not having enough pins. I have more than a hundred....but need to use a lot to hold down the edges of the sections whilst the glue is drying.
If I can get the scenery at this end of the layout finished by the end of this week, then I'll be happy!
Re: The Bridge
With a few days progress under my belt I can report I have now finally got all of the road sections glued into place and have been able to do a dry run of locating the remainder of the buildings:
Parallel to this, I've been progressing on with adding fences, walls and general shrubbery and trees on the lower section of the village. Here's the current view of the area I've just finished adding flock, etc to. As in previous pictures, things look slightly pale because the PVA glue still needs to dry. There's also a few pins to remove, and some debris to clear up!! Yesterday, I had something happen for only the second time on this build.....as I was vacuuming up surplus bits and pieces, one of the un-glued buildings disappeared up the suction hose! Good job my vacuum is a Dyson and I could see where it ended up in the collection chamber without having to empty everything out! Another problem unique to T.
This shot is a day or two old and doesn't show the latest stae of the ground surface....which has turned green in several places.
Parallel to this, I've been progressing on with adding fences, walls and general shrubbery and trees on the lower section of the village. Here's the current view of the area I've just finished adding flock, etc to. As in previous pictures, things look slightly pale because the PVA glue still needs to dry. There's also a few pins to remove, and some debris to clear up!! Yesterday, I had something happen for only the second time on this build.....as I was vacuuming up surplus bits and pieces, one of the un-glued buildings disappeared up the suction hose! Good job my vacuum is a Dyson and I could see where it ended up in the collection chamber without having to empty everything out! Another problem unique to T.

Re: The Bridge
Genious! The last image - just like the real thing.
Are you planning a background image or something similar?
Cheers
Kupzinger
Are you planning a background image or something similar?
Cheers
Kupzinger
Re: The Bridge
I do have a backdrop to install. It's plain blue at present and plans are to hand paint a background onto it........but I don't think I'll get chance to do this before the first outing.Are you planning a background image or something similar?
I was thinking at one time to generate an image from Google Earth and then poster print it onto iron-on transfer paper, and then apply the transfer onto the background cloth. The only problem is that the background cloth has to be made out of flameproof material to conform to the H&S requirements of some exhibition halls.....and I'm not sure if the material is suitable to be heated for the application of the transfers! This is something I need to investigate when I get time.