And 1 year on from it's first outing I finally got to see it.
It is an impressive display, (Even if I was slightly wilting due to the heat) The expansion joint at the end of the bridge that you were pointing out to one of the other visitors was how shall I put it, needed.
Search found 5 matches
- Mon Jun 19, 2017 9:00 pm
- Forum: Show Details & Reports
- Topic: CGR Model Event 2017
- Replies: 3
- Views: 5642
- Wed Jan 18, 2017 10:04 pm
- Forum: T Gauge Layouts
- Topic: The Bridge
- Replies: 450
- Views: 451857
Re: The Bridge
Do you have a list of this years events yet, I still want to see this in the plastic so to speak.
- Sun Jun 26, 2016 9:10 am
- Forum: T Gauge Layouts
- Topic: The Bridge
- Replies: 450
- Views: 451857
Re: The Bridge
I know that essentially this build is now complete, but I do hope that you continue posting. Have you sorted the issue with the side frames on the HST? Could you make a heritage set (Deltic and coaches, I know I have seen an etch for this) More vehicles and that ship. And keep us up to date as to wh...
- Thu Apr 28, 2016 5:47 pm
- Forum: T Gauge Layouts
- Topic: The Bridge
- Replies: 450
- Views: 451857
Re: The Bridge
QUOTE "Well volunteered! I'll have as many as you can do. "
Although I did in a roundabout way work for Peugeot (Assembling wiring looms), I do not own a 3D printer
Although I did in a roundabout way work for Peugeot (Assembling wiring looms), I do not own a 3D printer

- Wed Apr 27, 2016 3:58 pm
- Forum: T Gauge Layouts
- Topic: The Bridge
- Replies: 450
- Views: 451857
Re: The Bridge
Those car parks still look remakably bare.
When do you intend to strike up production on the cars?
Or is Cowley still out on strike
?
When do you intend to strike up production on the cars?
Or is Cowley still out on strike
