Board index Talking T Gauge Forum T Gauge Layouts

Post details of your T gauge layouts and the progress you are making.

Re: Severn Valley Railway - Ironbridge Station

Postby Nutter » Thu Dec 07, 2017 10:53 am

track plan is going to be a single track for now, but with space for the sidings etc as and when points are sorted.
Proposed plan is now to build it as if the station had not been demolished and the SVR had continued down the line as a heritage line.
Signal Box, Station Building(thank you Doug) all ready .
No pictures at the moment because a box of bits does not really show where I am currently am at :( plus I really need to do some painting but the weather is not good for spraying stuff in primer outside-(wet, windy, and cold) :roll:
Mike based on the Southern side of London

All spray painting done outside, cleaning in ultrasonic done on dry days when i can have a window open.
User avatar
Nutter
 
Posts: 380
Joined: Tue Feb 24, 2015 12:05 pm

Re: Severn Valley Railway - Ironbridge Station

Postby Nutter » Sun Dec 17, 2017 6:49 pm

First bits now in primer,about 10 more bits to do, but they need to go in the ultrasonic cleaner first.
Every model I paint gets a coat of Halford's grey Primer regardless. :D
Guess what I shall be doing over xmas if I can prime the last 10 bits.
Mike based on the Southern side of London

All spray painting done outside, cleaning in ultrasonic done on dry days when i can have a window open.
User avatar
Nutter
 
Posts: 380
Joined: Tue Feb 24, 2015 12:05 pm

Previous

Return to T Gauge Layouts

Who is online

Users browsing this forum: Bing [Bot], dkightley and 1 guest


cron